modification
modification

Subsequent changes to any aspect of the confirmation may be treated as a cancell

Source page 13

Sourced from the RCI-Points-Disclosure-Guide-CW-Plus source document

Our extraction pipeline is still preparing a detailed analysis for this page. The raw rate grid above is pulled directly from the RCI-Points-Disclosure-Guide-CW-Plus source document and is the authoritative reference while our editors finalize the long-form guide.

Rule, verbatim

Subsequent changes to any aspect of the confirmation may be treated as a cancellation.